The lowest solar yield in these 19 towns, and the one place where travel can push an installation toward the top of the band. The city itself is not automatically eligible for the Home Energy Scotland rural uplift. Many surrounding Highland and island postcodes are. Ask Home Energy Scotland to check the postcode rather than assuming the uplift.
GrantHome Energy Scotland
Solar yield, south roof789 kWh/kW
Install prices8% above the Midlands reference
PVGIS point57.48, -4.22
Across these 19 towns the city-centre yield runs from 789 kWh per kW in Inverness to 1,031 in Southampton. Inverness is 789. A roof that faces east, or sits in shade, will be lower than that. The calculators apply direction and shade. This page is the south-facing, lightly shaded case.
These prices sit a little above the rest of Scotland, because installers often travel further. The calculators open on the usual Scotland band.
Heat pump, 3-bedroom air-to-water
Gross install cost
£11,340 to £16,740
Home Energy Scotland grant
£7,500
Net out of pocket
£3,840 to £9,240
Against mains gas, October 2026 cap
about £20 a year less to run
Running cost uses the Great Britain average price cap and a seasonal efficiency of 3.0. It is the same model in every town. Replacing oil or LPG in England or Wales can move the grant to £9,000. In Scotland the rural uplift is a postcode check, not a town name.
Import rate 26.32p, the October to December 2026 cap. Export 6p. South-facing, little shade. A battery or a different roof changes the payback in the calculator.
Same place, no flue change, no move, no thermostat and no magnetic filter. Add those on the quote checker and the band moves. A quote under the band still needs a look at what was left out.